Server Relocation Service

GPIT’s server / data center relocation service moves your systems to a new location (data center, server room, colocation) safely, on schedule and with minimal downtime.

Problems businesses often face

  • Moving office / renting new colocation space, but worried about equipment failure or data loss during dismantling and transport.
  • No connection diagram, so the system can’t be restored to its original state after the move.
  • Downtime runs longer than planned, affecting operations and business.
  • Multiple scattered vendors (power, network, transport) with no one taking overall responsibility.

Scope of work

  • Survey & document the current state: equipment inventory, physical & logical diagrams, service dependencies.
  • Design the new location: rack layout, power & UPS, cooling, network & fibre cabling, earthing.
  • Plan the move: shutdown/startup order, time windows, contingency and rollback plans.
  • Back up before the move: full backup, with a restore test.
  • Dismantle – transport – install: shock-proof packing, transport, connection per the design.
  • Testing & acceptance: power up the system in order, check services, hand over as-built documentation.

Delivery process

  1. Survey both ends – the current and the new location.
  2. Detailed design & move plan – timeline, staffing, risks, rollback plan.
  3. Sign the contract & NDA.
  4. Prepare the new location – install power, network, cooling and rack infrastructure.
  5. Carry out the move – within the agreed time window, with supervision.
  6. Acceptance & handover – report, as-built diagrams, warranty.

Service commitment (SLA)

  • A committed downtime window and a clear rollback plan.
  • Certified infrastructure & virtualization engineers (VMware, Cisco).
  • A full backup before the move; an NDA in place.
  • A 12-month warranty on infrastructure work at the new location.

Frequently asked questions

Can the move be done after hours / at the weekend to avoid disruption?
Yes. Most relocation projects are carried out at night or over the weekend on request.

Does GPIT also “tidy up” a messy data center?
Yes – including reorganising racks, labelling, standardising connections and updating diagrams.

Plan your server relocation with GPIT

Leave your details or call +84 945 886 818 – GPIT responds within the working day.

    Contact Me on Zalo
    0945886818